- P1010002a
View of the screen from the back of the theater - P1010004
The back of the frame from up on the mezzanine - Painting the video wall in the TMC.
- Cable trays mostly in place. They still have to finish the extension to the video wall.
- P1010002
Fitting the display frame to the opening - P1010014
The rear view of the installed frame